Gangway 24.5 meter

$0.00

Specifications

Category:Renewables equipment

YOM:New

Class:Bureau Veritas Classification

Location:Holland

Price:Please enquire

Lease:yes, please enquire

Type:Roll & Pitch compensation

Note:

This state-of-the-art W2W system provides direct access with an elevator for personnel and cargo to the +18 meter level of the offshore structure. This improves safety, comfort and allows continuous access without undocking the system.
The distinctive difference between this gangway and all the other W2W systems that provide access at height is the patented Roll & Pitch compensation. This
compensation system keeps the mast 100% vertical at all times by eliminating the roll and pitch movement at the bottom of the mast so that Roll & Pitch movement of the vessel have no additional effect on the position of the column-top and Bridge tip.
The length is 24,5 mtr.
HPU is located in deck container

Quantity:
Add To Cart

Specifications

Category:Renewables equipment

YOM:New

Class:Bureau Veritas Classification

Location:Holland

Price:Please enquire

Lease:yes, please enquire

Type:Roll & Pitch compensation

Note:

This state-of-the-art W2W system provides direct access with an elevator for personnel and cargo to the +18 meter level of the offshore structure. This improves safety, comfort and allows continuous access without undocking the system.
The distinctive difference between this gangway and all the other W2W systems that provide access at height is the patented Roll & Pitch compensation. This
compensation system keeps the mast 100% vertical at all times by eliminating the roll and pitch movement at the bottom of the mast so that Roll & Pitch movement of the vessel have no additional effect on the position of the column-top and Bridge tip.
The length is 24,5 mtr.
HPU is located in deck container

Specifications

Category:Renewables equipment

YOM:New

Class:Bureau Veritas Classification

Location:Holland

Price:Please enquire

Lease:yes, please enquire

Type:Roll & Pitch compensation

Note:

This state-of-the-art W2W system provides direct access with an elevator for personnel and cargo to the +18 meter level of the offshore structure. This improves safety, comfort and allows continuous access without undocking the system.
The distinctive difference between this gangway and all the other W2W systems that provide access at height is the patented Roll & Pitch compensation. This
compensation system keeps the mast 100% vertical at all times by eliminating the roll and pitch movement at the bottom of the mast so that Roll & Pitch movement of the vessel have no additional effect on the position of the column-top and Bridge tip.
The length is 24,5 mtr.
HPU is located in deck container

BROKER

Name: Roland Brautigam
Tel: +33 6 40 61 69 03

 

If you're looking for specific information you can't see listed, please tell us below or contact the broker